Innisfil
Industrial Park
6875 10 Sideroad, Innisfil, Ontario. Approximately 102 acres of development land on the Highway 400 corridor, envisioned as a fully serviced Class-A employment park: logistics, advanced manufacturing, cold storage and flex industrial, built to the Town of Innisfil’s employment-growth objectives.
Presented by Fardad Farhanian, Broker · RealtyMan · RE/MAX Realtron
102 acres of open, level farmland on 10 Sideroad.

What exists
Open agricultural land with road frontage on 10 Sideroad, regular parcel shape, minimal tree cover and no structures to clear - a clean canvas for large-format employment buildings. Full survey, topographic, environmental and engineering reports are available under NDA.
Why industrial
Innisfil is one of Simcoe County’s fastest-growing municipalities, with direct Highway 400 access, the Innisfil GO expansion and the Orbit transit-oriented community driving employment demand. Large-bay industrial vacancy across the northern GTA remains tight; a serviced 102-acre site within an hour of Toronto is rare.
Every acre working: full build-out, boundary to boundary.
A gated monument entrance on 10 Sideroad, a central spine with roundabout, large-bay logistics on the north half, flex and manufacturing on the south, a truck marshalling yard and a naturalized stormwater pond in the low corner.
Indicative building program.
| Format | Buildings | Typical size | Target users |
|---|---|---|---|
| Class-A logistics / distribution | 3–4 | 250,000–450,000 sf · 40′ clear | 3PL, e-commerce fulfilment, national distributors |
| Advanced manufacturing | 2 | 120,000–200,000 sf · 32′ clear | Food, auto parts, building products |
| Cold storage / food processing | 1 | 150,000 sf · refrigerated docks | Grocery distribution, agri-food |
| Multi-tenant flex industrial | 2–3 | 40,000–80,000 sf · 6–12 units | Trades, contractors, light assembly |
| Truck marshalling & services | 1 yard | ~6 acres | Trailer storage, fuel, driver services |
Areas are indicative at ~50% site coverage across the full 102 acres before roads, stormwater and buffers, and will be refined through the planning and servicing process.
A place of work for thousands.



A landmark entrance on 10 Sideroad.
Limestone monument sign, guardhouse, landscaped boulevard and full truck-turn geometry at the gate.
Class-A logistics and distribution.



Manufacturing, cold storage and flex.



Spine road, roundabout, street trees, sidewalks.
Built to municipal standard for assumption, with full truck geometry and separated pedestrian routes.
Working 365 days.




The full 102 acres, built out.
15-second 1080p orbit generated from the property’s actual aerial photograph.
Where the project stands.
Access
Highway 400 corridor, direct access; Barrie GO a short drive; future Innisfil GO planned; Toronto in 50–60 minutes.
Planning
Agricultural land outside the current settlement boundary. Provincial Planning Statement 2024 allows settlement-area expansion requests at any time; the Highway 400 / 6th Line interchange (ESR addendum complete) and the Innisfil Heights employment-area expansion are the key regional triggers.
Path forward
Employment-area designation and zoning by-law amendment supported by a planning rationale, transportation impact study, functional servicing and stormwater reports, and an environmental impact study.
What we are asking for.
Town of Innisfil
Pre-consultation on employment designation for the 10 Sideroad lands, aligned with Innisfil Heights and the 6th Line interchange.
Capital & partners
Land and pre-development facility through approvals; joint-venture or forward-sale interest from institutional industrial developers.
Broker
Fardad Farhanian
Broker · RealtyMan · RE/MAX Realtron
+1 (416) 707-1031 · info@realtyman.ca
Renderings and film are artist’s concepts for illustration only, generated from the property aerial; building sizes, layouts and counts are indicative and subject to municipal approvals.